Overblog Suivre ce blog
Administration Créer mon blog
Le blog de fukushima-is-still-news

Le blog de fukushima-is-still-news

information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise

Les articles avec le tag : daiichi nuclear plant

19/01/2018 Publié depuis Overblog

Resuming investigation of No.2

January 16, 2018 Tepco to resume attempt to probe damaged reactor at Fukushima No. 1 plant https://www.japantimes.co.jp/news/2018/01/16/national/tepco-resume-attempt-probe-damaged-reactor-fukushima-no-1-plant/#.Wl3BZHkiGos...

En savoir plus

24/12/2017 Publié depuis Overblog

New device to probe Fukushima's insides

December 23, 2017 Toshiba unveils device for Fukushima nuclear reactor probe http://www.asahi.com/ajw/articles/AJ201712230012.html...

En savoir plus

04/12/2017 Publié depuis Overblog

Can't stay more than 20 minutes on the roof

December 4, 2017 Fukushima dome roof takes shape, but radiation remains high By CHIKAKO KAWAHARA/ Staff Writer...

En savoir plus

01/12/2017 Publié depuis Overblog

Corroded tubes

December 1, 2017 Image shows extent of damage to reactor at Fukushima plant THE ASAHI SHIMBUN An image taken by...

En savoir plus

26/11/2017 Publié depuis Overblog

Icewall: Disappointing

November 26, 2017 Fukushima 'ice wall' linchpin not living up to high hopes http://www.asahi.com/ajw/articles/AJ201711260031.html...

En savoir plus

25/11/2017 Publié depuis Overblog

Under the facelift

November 25, 2017 Fukushima face-lift masks morass inside https://www.japantimes.co.jp/news/2017/11/25/national/fukushima-face-lift-masks-morass-inside/#.WhmDAHmDOos...

En savoir plus

25/11/2017 Publié depuis Overblog

And so the tanks remain

November 25, 2017 Still at a stalemate as Fukushima’s radioactive water grows by 150 tons a day https://www.japantimes.co.jp/news/2017/11/25/national/japan-stalemate-fukushima-radioactive-water-grows-150-tons-day/#.Whl_33mDOos...

En savoir plus

22/11/2017 Publié depuis Overblog

Fukushima plant opened to media

November 22, 2017 Once severely damaged Fukushima reactor building opened to media to showcase progress https://mainichi.jp/english/articles/20171122/p2a/00m/0na/017000c#cxrecs_s The...

En savoir plus

18/10/2017 Publié depuis Overblog

New incinerator at Fukushima Daiichi

Fukushima Daiichi waste incinerator starts up http://www.world-nuclear-news.org/WR-Fukushima-Daiichi-waste-incinerator-starts-up-2203164.html...

En savoir plus

29/09/2017 Publié depuis Overblog

Faulty equipment (2)

September 29, 2017 Botched gauge settings might have contaminated Fukushima groundwater from April onward: Tepco...

En savoir plus

29/09/2017 Publié depuis Overblog

Faulty equipment may have masked leaks

September 29, 2017 Fukushima plant may have leaked radioactive water https://www3.nhk.or.jp/nhkworld/en/news/20170929_19/...

En savoir plus

27/09/2017 Publié depuis Overblog

Melted fuel but also contaminated water and radioactive waste still to be faced

September 27, 2017 Melted fuel, other challenges left in Fukushima nuclear cleanup http://www.asahi.com/ajw/articles/AJ201709270019.html...

En savoir plus

27/09/2017 Publié depuis Overblog

Nos 1& 2 reactors: Plans for decommissioning revised

September 26, 2017 3-year delay in removal of fuel rods from Fukushima plant http://www.asahi.com/ajw/articles/AJ201709260025.html...

En savoir plus

26/09/2017 Publié depuis Overblog

Fuel removal delayed again (2)

September 26, 2017 Spent nuclear fuel removal at Fukushima plant to be delayed again https://mainichi.jp/english/articles/20170926/p2g/00m/0dm/064000c#cxrecs_s...

En savoir plus

11/09/2017 Publié depuis Overblog

Using drones for safety to measure radiation inside

September 10, 2017 Drone to measure radiation inside tainted Fukushima plant buildings https://mainichi.jp/english/articles/20170910/p2g/00m/0dm/008000c#cxrecs_s...

En savoir plus