Overblog Suivre ce blog
Administration Créer mon blog
Le blog de fukushima-is-still-news

Le blog de fukushima-is-still-news

information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise

26/11/2014 Publié depuis Overblog

AKepco applies for 20-year extention for Takahama

November 26, 2014 Kepco wants to extend lifespan of 40-year-old Takahama reactors to 60 years http://www.japantimes.co.jp/news/2014/11/26/national/kepco-wants-extend-lifespan-40-year-old-takahama-reactors-60-years/#.VHX0k8l5Cos...

En savoir plus

26/11/2014 Publié depuis Overblog

Energy policy: Wait till summer

November 26, 2014 Industry minister sets summer deadline for energy policy http://ajw.asahi.com/article/behind_news/politics/AJ201411260046...

En savoir plus

26/11/2014 Publié depuis Overblog

Restart Temperature Engineering Test Reactor (Oarai)?

November 26, 2014 JAEA eyes restart of next-generation nuclear reactor JIJI The Japan Atomic Energy Agency on Wednesday...

En savoir plus

25/11/2014 Publié depuis Overblog

Vision for no-nuke society missing

November 25, 2014 Editorial: Clarify vision for a society free of nuclear power http://mainichi.jp/english/english/perspectives/news/20141125p2a00m0na008000c.html...

En savoir plus

25/11/2014 Publié depuis Overblog

Start of new plan for tunnels

November 25, 2014 Work starts to fill tainted underground tunnels http://www3.nhk.or.jp/nhkworld/english/news/20141125_28.html...

En savoir plus

25/11/2014 Publié depuis Overblog

Antinuclear candidates wanted!

November 23, 2014 LDP incumbents look to have electoral lock on nation’s nuclear heartland Staff Writer OSAKA –...

En savoir plus

25/11/2014 Publié depuis Overblog

Japan & green energy

A losing bet on green energy http://www.japantimes.co.jp/opinion/2014/11/25/commentary/japan-commentary/a-losing-bet-on-green-energy/#.VHSXIMl5B1s...

En savoir plus

25/11/2014 Publié depuis Overblog

Nukes: What future?

November 25, 2014 Nuclear power’s dark future http://www.japantimes.co.jp/opinion/2014/11/25/commentary/world-commentary/nuclear-powers-dark-future/#.VHS3uMl5B1s...

En savoir plus

23/11/2014 Publié depuis Overblog

NRA's translation of interim report on 3/11

http://www.nsr.go.jp/english/library/data/special-report_20141104.pdf October 2014 Interim report by the NRA Analysis...

En savoir plus

23/11/2014 Publié depuis Overblog

Decommissioning of Fukushima Daini

November 17, 2014 Fukushima Gov. seeks Daini plant decommissioning http://www3.nhk.or.jp/nhkworld/english/news/20141117_40.html...

En savoir plus

23/11/2014 Publié depuis Overblog

Votive tablets for tourists

November 22, 2014 Fukushima village promotes tourism with new votive tablet http://mainichi.jp/english/english/newsselect/news/20141122p2a00m0na009000c.html...

En savoir plus

23/11/2014 Publié depuis Overblog

The 20-year extension

November 23, 2014 Kepco weights new lease of life for geriatric reactors http://www.japantimes.co.jp/news/2014/11/23/national/kepco-weights-new-lease-life-geriatric-reactors/#.VHG-V8l5B1s...

En savoir plus

23/11/2014 Publié depuis Overblog

Restart depends also on Government's stability

November 22, 2014 Poll loss might trigger meltdown in LDP’s reactor restart campaign http://www.japantimes.co.jp/news/2014/11/22/national/politics-diplomacy/poll-loss-might-trigger-meltdown-in-ldps-reactor-restart-campaign/#.VHCliMl5B1s...

En savoir plus

22/11/2014 Publié depuis Overblog

Concrete No.2 and No.3 seaside trenches

November 22, 2014 After failures, TEPCO to use special cement to prevent contaminated water leaks http://ajw.asahi.com/article/0311disaster/fukushima/AJ201411220029...

En savoir plus

22/11/2014 Publié depuis Overblog

Starting on unspent fuel

November 21, 2014 TEPCO starts transferring remaining unspent fuel from Fukushima No. 4 reactor http://ajw.asahi.com/article/0311disaster/fukushima/AJ201411210037...

En savoir plus