Overblog Suivre ce blog
Editer l'article Administration Créer mon blog
Le blog de fukushima-is-still-news

Le blog de fukushima-is-still-news

information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise

"Just peeking"

February 23, 2017

Fukushima robots not enough to devise fuel-removal plan for reactor 2: Tepco

http://www.japantimes.co.jp/news/2017/02/23/national/pics-fukushima-robots-not-enough-devise-fuel-removal-plan-reactor-2-tepco/#.WK_msPKDmos

 

by Kazuaki Nagata

Staff Writer

 

OKUMA, FUKUSHIMA PREF. – While a recent investigation found what may be melted nuclear fuel rods in reactor No. 2 containment vessel at the Fukushima No. 1 plant, that information isn’t nearly enough to devise an effective method for removing it, the chief of the plant told reporters during a media tour Thursday.

“We put in cameras and robots and obtained valuable images, though they were partial . . . but it’s still unclear what is really going on there,” said Shunji Uchida, who became chief of the crippled plant last July. “We first need to know the situation of the debris.”

Last month, the utility inserted a 10.5-meter rod with a camera on its tip into a hole in the No. 2 reactor’s primary containment vessel and discovered black lumps sticking to the grating directly underneath the suspended pressure vessel, which holds the core.

Tepco claims it is still unsure whether the lumps are really melted fuel that burned through the bottom of the pressure vessel. Although it is still years away from actually trying to remove the fuel, Tepco, the government and related parties are planning to decide on a basic strategy this summer and go into more detail next year.

Uchida described last month’s surveillance operation as “just peeking.”

Engineers are playing with the idea of refilling the primary containment vessel with water during debris cleanup operations to reduce the intensity of the radiation, but since the PCV was probably damaged during the meltdown crisis in March 2011, the water that’s being pumped in 24/7 to keep the fuel cool is just leaking back out.

According to past analyses, some of the melted fuel rods penetrated the pressure vessel and fell into the containment vessel surrounding it after the March 11 quake and tsunami caused a station blackout at the plant, crippling all cooling functions.

 

Partager cet article

Repost 0
Pour être informé des derniers articles, inscrivez vous :

Commenter cet article